|
Specification |
Structure
All Load bearing walls shall be of bricks.
R.C.C columns & beams will be provided
as per the structural design requirement.
The entire structure will be earthquake resistant.
Flooring
Marble/Vitrified tiles flooring in Drawing/Dining/Lobby, Bed Rooms, Anti-skid Ceramic
Tiles for Balconies and Kitchen.
Water Supply
Quality tested high standard/PPR pipes and Fittings shall be provided for water
supply. Each apartment shall be provided with an independent water storage tank.
All PVC,Pipes and fittings used will be of ISI Mark
Toilets
Wall tiled
up to ceiling in toilets, Granite top with wash basin, anti skid tiles
flooring,
European WC, Towel Rail, Soap Dish, Shower, Mirror, Branded Fittings, provisional for hot and cold water supply.
Kitchen
Polished
Granite workstation, Stainless Steel Sink, glazed tiles up to 24"
height above workstation and provisional for Gas Geyser for hot water supply.
Electricals
Copper
wiring, concealed conduits, Protective MCB, Modular Switches, Provisional
for sufficient
power and light points in all rooms, TV, Cable and telephone sockets in drawing,
dining and bedrooms.
Doors & Windows
All chowkhats, and window shutters shall be of Hollac wood. Panelled/ Glazed doors
and windows.
Interiors
Internal walls shall be plastered and painted with oil bound of Asian make distemper.
POP cornice and design shall be provided
on the ceilings of the bedrooms. The drawing room will be decorated with false ceiling
of POP.
Exterior
The exterior
shall be finished with external coating of superior quality paint to give an enchanting
looks for years to come.
|
|